Extension Without Planning Permission in Chorley, Lancashire

Many single storey extensions in Chorley and the rest of Lancashire can go ahead without a full planning application, because they fall under permitted development rights. Those rights come with strict limits on size, height and position, and some properties don't have them at all. This guide explains the main rules, the common traps, and what applies to accessibility adaptations as well as ordinary extensions.

Published 17 November 2026

What permitted development allows

Permitted development lets you extend a house without applying for planning permission, as long as the extension stays within national limits. Chorley Council, Burnley Borough Council and the other Lancashire authorities all apply the same national rules. Some areas also have local restrictions on top. These are the main limits for a house:

Larger extensions and prior approval

Under the larger home extension scheme, a single storey rear extension can go up to 6 metres deep on an attached house or 8 metres on a detached one. You have to notify the council first. The council then consults your neighbours and decides whether the effect on them is acceptable. You must not start work until you have approval, or until the decision period has passed without a decision.

This route suits a lot of open-plan kitchen extensions on Lancashire semis and terraces. It still needs proper drawings and a bit of patience, so allow for it in your timescale.

When you will still need planning permission

Permitted development rights do not apply everywhere, and "original house" means the house as first built, or as it stood on 1 July 1948. If an earlier owner has already extended, some or all of your allowance may already be used up. You will usually need a full application if any of the following apply:

Building regulations and the Lawful Development Certificate

Even if you don't need planning permission, almost every extension needs building regulations approval. This covers structure, foundations, insulation, drainage, fire safety and ventilation. Skipping it can cause real trouble when you come to sell.

If you are confident your plans are permitted development, it is worth applying to the council for a Lawful Development Certificate before you start. It costs much less than a full planning application and gives you formal proof that the extension is lawful. Buyers' solicitors often ask for one. Before you rely on any rule above, check with your council or a planning professional, because the details can change.

Accessibility adaptations and social housing

Wet rooms and most internal changes do not need planning permission, though building regulations may still apply to drainage, ventilation and structural work. Ramps are trickier. A raised platform or ramp more than 0.3 metres above ground level is not permitted development, so a longer access ramp to a front door may need a planning application.

Councils and housing associations commissioning adaptations should check the tenure and planning history of each property, especially flats and homes in conservation areas. Ground floor bedroom or bathroom extensions for disabled residents follow the same size limits as any other extension. Planning ahead avoids delays for residents who are waiting for the work to be done.

Frequently Asked

Can I build a 3 metre rear extension in Chorley without planning permission?+
Often yes, if it is a single storey extension on a house, within the height limits, and the property hasn't lost its permitted development rights. Check for conservation area status, Article 4 directions or planning conditions first.
Do I need building regulations if I don't need planning permission?+
Almost always, yes. Building regulations are separate from planning and cover how the extension is built, including foundations, insulation, drainage and fire safety.
Does a disabled access ramp need planning permission?+
A low ramp often doesn't, but any raised platform or ramp more than 0.3 metres above ground level falls outside permitted development. Then you will usually need to apply for planning permission.